Fire damage restoration and summer work. Replaced 100 doors, several thousand linear feet of drywall damaged by winter sprinkler failure in space controlled by the landlord. Work also included modifying and adding storefront and railings to central atrium/stair case and a test storage vault. All work executed in a 4-week period.